THAI AUTOMOTIVE SUPPLY CENTER

Status


Completed

Design


**

Project Manager


PPS Design Co., Ltd.

Site Location


**

Project Duration


**

Detail


  • PPS design Ltd. was responsible for architectural and structural design for this 6,825 square meters(The Automotive Supply Centre) at Eastern Seaboard Industrial Estate, Rayong, 6,600 square meters(Thai Petrochemical Logistic Centre Phase III) and 9,950 square meters(Thai Petrochemical Logistic Centre Phase IV) factory/warehouse at Map Ta Pud Industrial Estate , Rayong.    
  • The Katoen Natie Group. develops (design, build, own and operate) logistic terminals that handle (amongst others) petrochemical products. These logistic platforms can be found worldwide.